Brief Description: Complete right aileron assy, start on left aileron
Completed riveting the right aileron, W04-01R. There is a constuction note emphasizing keeping the aileron flat prior to riveting. Even with the clecos in, there is enough tolerance so that the aileron can be twisted back and forth slightly. I weighted the flap slightly while flat on the bench before I started to pull the rivets.
Started rib layout for -01L. Pilot drilled rib skin holes.